Client Yem Technology
Location Sino Iron Project, Cape Preston, WA
Job Title 28” Pipe Manifolds
Service Pressure Piping
Value Up to $250k
28” Pipe Manifolds   Yem Technology 28” Pipe Manifolds   Yem Technology

Scope Of Work

3D model drafting, material procurement, fabrication, NDT, sandblast & painting and pack for shipment.

Project Resourcing

Fabrication

  • Required coded welders and boilermakers experienced in
    piping fabrication.
  • Project Manager provided single point of contact with the client.

Installation

  • Not included – shipping and site installation at Cape Preston by others.
  • Project Achievements
  • APMS provided a comprehensive project management
    service.
  • All activities were managed to the satisfaction of the client
    with minimal intervention.

Key Activities

Fabrication

  • Detailed mechanical design to AS1210 and verification
  • 3D modelling and preparation of Autocad drawings
  • Material procurement, including filters
  • Workshop fabrication
  • Coded TIG and FCAW welding to AS3992
  • 100% material and weld traceability
  • Coordination of multiple subcontractors including non-
    destructive testing (NDT), hydro testing, blasting & painting,
    logistic arrangements and documentation for shipping.
  • Liaise with the client to ensure Manufacturers Data Report
    (MDR) contained the information required and drawing
    updates.

Installation

  • Not applicable